Feature façade framing modules for transport infrastructure
Mooroolbark Level Crossing Removal Project
Precision framing for a distinctive façade featuring architectural modules as part of Victoria’s Level Crossing Removal Project.
High-quality. Strict safety.
Feature architecture for major infrastructure
CMG Frames fabricated and installed precision framing systems designed to support the project’s distinctive façade elements. Integrating the series of feature architectural modules within the new station precinct required careful coordination with Cox Architecture and construction partners John Holland, ensuring each component aligned accurately with the broader structural and architectural framework.
As a major infrastructure program, the Mooroolbark project required high-quality outcomes within strict timelines and safety standards.
Efficient. Streamlined. Consistent.
Leveraging our experience in Tier 1 façade projects and modular framing methodologies, we implemented efficient production and installation processes that reduced on-site complexity while maintaining consistency across all modules. Close collaboration with the builder and project consultants ensured seamless integration with other trades and adherence to program milestones.
Our work contributes to a modern, durable station environment, showcasing CMG Frames’ ability to deliver reliable, high-performance framing solutions across large-scale infrastructure projects.


