An impossible brick façade — how we solved it with prefabrication and LGS

Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.

Slow, expensive and impractical — that’s how the McNab Place project in Footscray would have been with traditional construction methods.

The apartment building’s podium façade is reminiscent of historic masonry buildings. Its highly articulated brick façade features deep, corbelled arches and stepped brickwork wrapped around the structure. For Roberts Co. builders, this presented a challenge.

“When the builder first came to us, the question was simple,” says Luke Cockerell, Managing Director of CMG Frames. “Is this even possible to build?”

The structural backup, complex lintels, heavy scaffolding and long construction durations would push the project beyond all limits. It wouldn’t be practical. It wouldn’t be economical.

How can you build 12-metre-long arches with extensive corbelling and stepped geometry on a tight site with limited time — with a true brick finish without the cost and delays that come with it?

With decades of experience delivering complex façades on major commercial and infrastructure projects, the team at CMG Frames had the know-how to find a solution.

Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.
Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.

“We’re not just designing what’s been drawn and handing it over. Clients come to us with an idea and ask, ‘How do we actually build this?’, and that’s where our experience really adds value.”

 

A prefabricated system, using lightweight light gauge steel framing, would mean a façade could be delivered to site in pre-bricked modular sections, ready to slot into place.

CMG Frames designed and manufactured this system at its state-of-the-art facility in Melbourne, then delivered it to Footscray. There the modules were craned into position and fixed to purpose-designed brackets attached to the already-waterproofed building structure.

CMG Frames’ innovative approach of installing it as a separate pre-fabricated, pre-clad outer layer turned a complex, site-intensive façade construction into a controlled, off-site solution.

But this was by no means a one-man job. While CMG Frames’ practical knowledge drove innovation, this project was delivered in conjunction with a specialist bricking contractor, the suppliers of real cut-brick cladding (Modular Masonry), and our industry partners Casello, which managed installation, lifting, cranage and onsite coordination.

This project is evidence of the transformative, cost-cutting and time-saving potential of lightweight steel frames, and the power of close coordination to deliver on complex ideas.

Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.
Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.
Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.
Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.
Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.
Prefabricated modular lightweight steel frame facade with a brick slip system by CMG Frames at Mcnab Avenue, Footscray.

Other blog posts

The stories behind our achievements

Learn more about what goes into CMG Frames’ hands-on approach to finding creative and innovative steel framing solutions for complex, ambitious and and large-scale construction projects.